The exhibits for the October 2017 Design Public Hearing are below.
Plan 1shows the draft layout of the lot when it initially opens (completed by 2019)
Plan 2shows the draft layout of the lot in its ultimate configuration (completed by 2040)
Plan 3also shows the draft 2040 ultimate configuration of the lot, but also includes surrounding planned ramps to the I-66 Express Lanes to illustrate access to the lot