1 / 18

The first section of box culvert is in place for the future shared-use path tunnel under Nutley Street. (November 17, 2021)
2 / 18

The first section of box culvert is in place for the future shared-use path tunnel under Nutley Street. (November 17, 2021)
3 / 18

The first section of box culvert is in place for the future shared-use path tunnel under Nutley Street. (November 17, 2021)
4 / 18

Work progresses on the shared-use path bridge over the ramp from I-66 West to Route 28 North in the Centreville area. (May 19, 2021)
5 / 18

Pavement is in place for upcoming traffic shifts along I-66 West near Route 286 (Fairfax County Parkway). (May 19, 2021)
6 / 18

Piers will support new overpasses at the I-495 Interchange. (May 19, 2021)
7 / 18

Beams have been installed for a new ramp connecting I-495 to the I-66 Express Lanes. (May 19, 2021)
8 / 18

Work progresses on the Express Lanes ramp near the Balls Ford Road Park and Ride Lot. (May 19, 2021)
9 / 18

Railing is being installed where the shared-use path will be elevated above the I-66 West roadway. (May 19, 2021)
10 / 18

Drivers heading south from the new Braddock Road/Walney Road overpass are temporarily separated from Route 28 South traffic by flexible posts. (May 19, 2021)
11 / 18

New bridge piers will support I-66 as it crosses over Route 29 in Centreville. (May 19, 2021)
12 / 18

The new Route 50 overpass is ready for concrete. (May 19, 2021)
13 / 18

The foundation and piers for the future Route 123 (Chain Bridge Road) South bridge are ready for bridge beam installation, which completed in late May 2021. (May 19, 2021)
14 / 18

Roadway widening is underway along I-66 between Jermantown Road and Route 123. (May 19, 2021)
15 / 18

Bridge foundations have been expanded for the widening of I-66 over Route 286 (Fairfax County Parkway) to add Express Lanes. (May 19, 2021)
16 / 18

Rebar from the existing I-66 West bridge over Route 286 (Fairfax County Parkway) has been exposed as part of widening the existing bridges to add Express Lanes. (May 19, 2021)
17 / 18

University Boulevard ramps are being constructed to connect with the future I-66 Express Lanes to and from the east. (May 19, 2021)
18 / 18

Piers are being constructed for ramps to Vaden Drive from the future I-66 East Express Lanes (May 19, 2021)
❮
❯